Work report

Monthly work report

The work report should show completed actions and their context, not manufacture a vanity number that is hard to defend later.

What belongs in the report

The report contains prepared fixes, completed delivery, activity, and selected money-page changes. It is a closed record of the work for a specific period.

Why the report is frozen

A shared link and PDF should point to the same data state. That keeps client-facing material from drifting a week after publication.

How to use it after publication

The report can go to the client, stay in the project archive, or become the starting point for the next month of work.

Open the work report

Move from issue inventory to a monthly record of what was actually completed.